Process

From the first visitto the first winter.

Six stages over eighteen months to two years. Each one ends with something you can hold: a board, a model, a drawing set.

A vaulted living room in morning lightTimber frame on a stone baseLime plaster samples on a boardA card model on a drawing deskAn oak kitchen with a long tableA sunken living room at dusk
Listening — Two to three weeks

Two to three weeks

Listening

We spend a day at the house or the site with you, then a second day without you. We ask how you live now, and what you would keep from every house you have loved.

A written brief in your wordsA first budget range

Two weeks

Survey

Measured survey, sun paths through the year, soil and structure. Old houses are drawn stone by stone, because the walls usually decide more than we do.

Measured drawingsSun and wind studies

Three weeks

The material board

Before any plan, we put three or four materials on a single board and live with them in the studio. Every later decision is tested against that board.

Physical samplesSupplier shortlist

Three to five months

Drawing

Plans, sections and card models, revised with you in the studio. We draw down to the joinery, so the builder prices the house we have actually designed.

Planning drawingsTender package, every detail drawn

Nine to eighteen months

On site

A partner is on site every week. We sign off each sample panel of plaster and every stone before it is laid, and keep you a short written diary of the build.

Weekly site visitsA build diary

The first year

Living in

We come back after the first summer and the first winter to adjust what the house has taught us: a hinge, a blind, a lamp moved a metre to the left.

Two return visitsA care book for every material